In order to have a longer span life of vibratory separator, vibratory separator need protection, so this article focuses on this question, from three points to express how to comprehensive protect the vibratory separator.
vibratory separator
First, precautions should be taken before vibratory separator’s operation
1. The transportation fixing bolt must be removed;
2. The equipment as a whole must be in a horizontal position;
3. After the equipment has been transported over long distances, all the fastening bolts must be inspected and tightened;
4. Whether the motor current is correct and whether it is single-phase operation;
5. Whether the motor rotates in the direction indicated by the arrow of the fuselage.
Second, the vibratory separator test operation:
First, a small amount of raw materials that need to be sieved or filtered is poured into the center of the screen, and the machine is adjusted according to the flow direction, angle, rate and processing amount of the raw materials.
1. Configure special rubber ring and bouncing ball;
2. Adjust the angle of the lower weight;
3. Increase the weight of the upper weight.
Third, the adjustment method of vibratory separator’s lower weight :
According to the different properties of various raw materials, in order to achieve the best screening effect, the upper and lower weight phase angles can be adjusted to effectively change the trajectory of the raw materials and prolong or shorten the movement time of the raw materials on the screen. Adjust the weight part, generally only adjust the lower weight, the upper weight generally does not need to change. When the angle between the upper and lower weights is adjusted from 0° to 15°, the angle between the lower weight and the upper weight must be adjusted by 15° according to the direction of the motor rotation.
Fourth, the method of changing vibratory separator’s mesh :
1. Loosen the bundle ring locking screw first, remove the screen frame, and remove the damaged screen;
2. Lay the screen on the fixed grid, press the pressure ring, tighten the fixing screws symmetrically, and tighten the screen to make the whole mesh surface smooth and evenly stressed;
3. Install the ball plate (note: the relative position of the ball plate and the pressure ring is fixed);
4. Put the rubber ball into the middle of the screen from the rubber plug, and finally plug the rubber plug, that is, complete the net loading.
Inquiry
* Your name
* Email
Phone
Company
* Message